According to the current situation of the company and ODM/OEM business characteristics, improve and establish the core management and control process.
Programme phase:Define the process requirements of new product quality control and the output requirements of each process node.
Design phase:Evaluate the early output evaluation test scheme and the first batch of inspection control scheme.
Trial production stage:Establish qualification requirements for new products to put an end to category An and B problems leading to the next node.
Mass production stage:Front-end management and control of product compliance risks (certification, water batches, packages).
Evaluation Test Assurance:The company has established a professional laboratory of water household appliances and equipped with professional testers; the evaluation and test items include: blasting, secondary, pressure resistance, environmental resistance (temperature, humidity), key parameters of water quality indicators (turbidity, residual chlorine, oxygen consumption, desalination rate, microorganisms, etc.) and packaging, transportation, etc.